This Machine is used for offline Coating.

Product Enquiry

ROLLER COATER MACHINE

This machine is used for offline coating . Any type of coating like UV, AQUEOUS VARNISH, PRIMER COAT can also be done on this machine. This machine is suitable for full coating on any type of paper.

FEATURES

  • Easy to operate & maintain.
  • Easily job change, minimize the make ready time
  • Available in 22”, 32” & 42” width formats
  • AC Drive with digital sheet counter meter.
  • Available in HMI control
  • Motorised varnish pump upgradable & Up Scalable
  • Easy & quick cleaning of varnish Tray
  • High pressure Air knife attachment for thin paper up to 150 GSM
Back to Top
Manufactures of Fully Automatic, Semi-Automatic, Manual Roller Coater .UV ,IR & Hot Air Conveyor for Offset machine, Screen Printing machines & All kind of 3D Object Coating attachment & Interdeck for Offset Printing machine. Semi-Automatic Screen Printing Machine for Flat and Round Object, Screen Exposure & All Kind of Related Accessories.
We are One of the largest manufacturers of Process Chillers, Gas Liquefaction Chillers, Medical Equipment Chillers, Dual Temperature Chillers, Milk & Beverage Chillers, Cascade Low Temperature Chillers

Dear All Customers,
Below are the safety Parameters for UV LED, Water Cooled UV system & regular maintenance:
  1. Use the R.O/distilled Water/Good quality water and change in a month. (If Water Quality is poor/city water change each week)
  2. We strongly recommended distilled water+ Anti frozen N with 70:30 Ratio.
  3. The pressure of water circulation should be about 20 PSI to 40 PSI (1.2 bar to 2.5 bar)
  4. The Temperature of chilled water should not be less than 200C (In any condition) without confirmation of SASG.
  5. If any case antifrozen N (Mono ethylene Glycol) is not available. We have a facility Rs. 270 per Litre (GST & Courier Charges extra as actual) , Minimum order qty will be 50 Litre.
  6. No warranty inclusive if any chip/diode/uv lamps is burned/ damaged due to poor water quality / physical damage/dirty working environment(should not deposit the dust in huge quantity at panel or LED module)
  7. If have any operation alarm on HMI concern with team SASG and don’t try to run it without resolving the same.
  8. If have any power fluctuation in this condition don’t run the LED without recommendation of team SASG.
  9. Clean the QRC in 15 days for smooth water flow

PRODUCT ENQUIRY

event